🏗️ IL Basement Renovation

Status: Active — Nigredo phase (strip back before build-up)

The basement is the Athanor. It must be engineered before it can become the laboratory.


Vision

A functional workshop and creative space. The physical embodiment of the 02_PRODUCTIONS folder — where the digital plans become built reality.


Zones

ZoneFunctionStatus
Fabrication BenchGold wire, bookbinding, tool storagePlanning
Media CornerScreening, sound, editing stationPlanning
Storage SystemBinned, labelled per Proxy naming conventionPlanning

The Local Bridge

  • Floor Plans / 3D: file:///Users/ronan/04_THE_PRODUCTIONS/IL_Basement_Renovation/

Active Tasks

  • [S] Measure dimensions — document in floor plan
  • [S] Inventory existing contents → create Proxy notes for retained items
  • [C] Define zone boundaries

Proxy Notes (Basement Items)

Add [SHOP-BIN-##] proxy notes to 03_THE_GRID/Artifact_Proxies/ as items are catalogued.