🏗️ IL Basement Renovation
Status: Active — Nigredo phase (strip back before build-up)
The basement is the Athanor. It must be engineered before it can become the laboratory.
Vision
A functional workshop and creative space. The physical embodiment of the 02_PRODUCTIONS folder — where the digital plans become built reality.
Zones
| Zone | Function | Status |
|---|---|---|
| Fabrication Bench | Gold wire, bookbinding, tool storage | Planning |
| Media Corner | Screening, sound, editing station | Planning |
| Storage System | Binned, labelled per Proxy naming convention | Planning |
The Local Bridge
- Floor Plans / 3D:
file:///Users/ronan/04_THE_PRODUCTIONS/IL_Basement_Renovation/
Active Tasks
- [S] Measure dimensions — document in floor plan
- [S] Inventory existing contents → create Proxy notes for retained items
- [C] Define zone boundaries
Proxy Notes (Basement Items)
Add [SHOP-BIN-##] proxy notes to 03_THE_GRID/Artifact_Proxies/ as items are catalogued.